Completed Oregon projects include:
Tillamook Airport. Electrical design for installation of PAPIs and a new AWOS, the addition of an automated vehicle gate, the addition of MIRL to R/W 1-19, and layout of a new electrical vault and control panel.
Lebanon State Airport. Electrical engineering for addition of two automated vehicle gates with security lights and a new obstruction light, including associated electric service additions and changes.
Corvallis Municipal Airport. Reverse engineering of existing control panel to permit additions and expansions, electrical design of new taxiway edge lighting, and changes to the electrical vault to accommodate additional equipment when required.
Seaside Municipal Airport. Electrical design for addition of pilot-controlled lighting that includes free-standing control cabinet, control panel, and electric service changes.
Rogue Valley International-Medford Airport. Electrical design for upgrade to apron lighting for security enhancement, including additions to the lighting control panel.
Eastern Oregon Regional Airport, Pendleton. Electrical design for Runway 7-25 lighting upgrade, replacement of taxiway lights, and relocation of PAPI powering equipment.
Columbia Gorge Regional Airport, The Dalles. Electrical design for Runway 12-30 and Runway 7-25 lighting installation, including installation of new controls.
Lake County Airport, Lakeview. Electrical design for new electrical control building, lighting control panel, and installation of runway 16-34 MIRL system.
Ashland Municipal Airport. Electrical design for installation of a new electrical equipment building, a new lighting control panel, and replacement of Runway 12-30 MIRL.
Hermiston Municipal Airport. Electrical design for control panel, electrical vault improvements, installation of electric gate, and installation of PAPI on Runway 4-22.