STUDY SERVICES

TriAxis engineers have many years of specialized experience in performing studies, developing plans, and providing special analyses for utility customers. They have completed work that includes:

  • Long Range Planning, including Load Forecasting
  • Capital Improvement Programs
  • Sectionalizing Studies
  • Protective Device Coordination Studies
  • Fault location estimates for distribution and transmission lines
  • Equipment condition and life-remaining assessments
  • Voltage Drop and Voltage Profile Studies
  • Capacitor Placement Assessments
  • Voltage Regulator Setting
  • Protective Relay Programming
  • Capacitor Bank Control Optimization
  • Multivariate Load Analysis
  • Thermal Modeling (using Finite Element Analysis) for Underground Cables
  • Analysis of Underground Cable Sheath Voltages and Currents
  • Computer Simulation of Capacitor Bank Transients
  • Service Entrance Fault Current Estimation