ALTA PHASE II 230-KV
Tehachapi/Mojave, CA
Owner: Terra-Gen Power
This 230-kV single-circuit overhead transmission line runs between the Phase II 3A Substation and the Phase II 4B Substation. The line is 3.9 miles long and is built primarily with tubular-steel poles. The tangent structures are H-Frame, and the large angles and deadends were constructed with single pole and 3-pole self-supported structures. The conductor is (2) 1272 kcmil 45/7 ACSR Bittern per phase.
This transmission line route crosses under two existing 500-kV transmission lines and over one 69-kV transmission line.
TriAxis was responsible for the preliminary and final design and construction period services.
Completion Date: 2011
Design work for which TriAxis was responsible: 100%