Shilo 3 PG&E Tap
|
Solano County, CA
|
enXco
|
230
|
OH
|
0.27
|
Flat Agricultural
|
Single-Circuit Steel Poles
|
Complete Design (in progress)
|
2011
|
|
Harrisburg 115-kV Pull Off
|
Harrisburg, OR
|
Consumers Power Inc.
|
115
|
OH
|
0.05
|
Flat
|
Single-Circuit Wood Guyed
|
Complete Design (in progress)
|
2011
|
|
Manzana Wind Project (Prelim & Final Design)
|
Kern County, CA
|
Iberdrola Renewables
|
230
|
OH
|
4.3
|
Flat Agricultural
|
Double-Circuit Self-Supporting Steel
|
Complete Design (in progress)
|
2011
|
|
Juniper Canyon
|
Goldendale, WA
|
Iberdrola Renewables
|
230
|
OH
|
20.4
|
Agricultural and Rolling
|
Wood H-Frame Single Circuit
|
Final Design
|
2010
|
|
Shepherds Flat
|
Arlington, OR
|
Rosendin Electric
|
34.5
|
OH
|
8.4
|
Agricultural and Rolling
|
Wood Pole Double Circuit & Single Circuit Collection
|
Complete Design
|
2010
|
|
Alta Wind Project
|
Mojave, CA
|
Rosendin Electric
|
230
|
OH
|
3.9
|
Flat Dessert
|
Single Circuit, Tubular Steel, H-Frame and Single-Shaft
|
Preliminary and Final Design
|
2010
|
|
East Columbia Lane
|
Boardman, OR
|
Umatilla Electric Cooperative
|
115
|
OH
|
1.2
|
Agricultural Flat
|
Wood Poles with Underbuild
|
Final Design
|
2010
|
|
Longview Fibre
|
Longview, WA
|
Wilson Construction
|
115
|
OH
|
1.25
|
River Embankment
|
Wood and Steel Poles
|
Design 115-kVAlternate Feed
|
2010
|
|
Juniper Canyon II
|
Roosevelt, WA
|
Iberdrola Renewables
|
230/34.5
|
OH
|
10-Jul
|
Hilly Rangeland
|
Wood Pole,
|
Preliminary Design and Routing Assistance
|
2010
|
|
Montague
|
Arlington, OR
|
Iberdrola Renewables
|
230
|
OH
|
8
|
Rangeland
|
Tubular Steel Poles
|
Preliminary Design for Permitting and ROW Acquisition
|
2010
|
|
2 Morrow Energy Wind
|
Boardman, OR
|
Umatilla Electric Cooperative
|
230
|
OH
|
18
|
Rangeland
|
Tubular Steel Poles
|
Preliminary Design for Route Selection
|
2010
|
|
Deer Creek
|
Blue River, OR
|
Eugene Water and Electric Board (EWEB)
|
115
|
OH
|
1
|
Mountains
|
Tubular Steel Poles
|
Realignment/Design of Transmission Line through USFS Land
|
2010
|
|
San Luis Solar Project
|
Mosca, CO
|
Iberdrola Renewables
|
115
|
OH
|
4
|
Flat Agricultural
|
Wood and Steel Poles with 12-kV Underbuild
|
Final Design
|
2010
|
|
Oro Verde Solar Project
|
Edwards AFB, CA
|
Fotowatio Renewable Ventures (FRV)
|
230
|
OH
|
20
|
Rangeland
|
Tubular Steel Poles
|
Preliminary Route Selection
|
2010
|
|
Shepherds Flat Ring-Future
|
Arlington, OR
|
Rosendin Electric
|
230
|
OH
|
12.7
|
Rolling Agricultural
|
Tubular Steel Poles
|
Complete Design
|
2010
|
|
Blythe Solar Project Solar Millenium
|
Central Valley, CA
|
West Coast Code Consultants (WC3)
|
230
|
OH
|
2
|
Flat Agricultural
|
Tubular Steel Poles
|
Third Party Permit Application Review
|
2010
|
|
Calico Solar Project Tessera Solar
|
Central Valley, CA
|
West Coast Code Consultants (WC3)
|
230
|
OH
|
3
|
Flat Agricultural
|
Tubular Steel Poles
|
Third Party Permit Application Review
|
2010
|
|
Imperial Valley Solar Project Tesssera Solar
|
Central Valley, CA
|
West Coast Code Consultants (WC3)
|
230
|
OH
|
3
|
Flat Agricultural
|
Tubular Steel Poles
|
Third Party Permit Application Review
|
2010
|
|
Palen Solar Project Solar Millenium
|
Central Valley, CA
|
West Coast Code Consultants (WC3)
|
|
OH
|
4
|
Flat Agricultural
|
Tubular Steel Poles
|
Third Party Permit Application Review
|
2010
|
|
Tule
|
San Diego, CA
|
Iberdrola Renewables
|
138
|
OH
|
9
|
Agricultural and Mountains
|
Double Circuit Steel Poles
|
Preliminary Siting & Permitting, Final Design
|
2010
|
|